01
Aluminium Cladding 鋁合金外牆包覆
Curtain-wall panels, podium feature panels, ventilated façades. Anodised, PVDF-coated and powder-coated finishes — engineered to BD wind-load and curtain-wall codes.
The bronze, aluminium and stainless-steel skin behind the city's most distinguished addresses — drawn, machined and installed by one group, since 2012.
№ 02 — Products
From façade panels to feature ceilings — the entire metal envelope, drawn, machined and installed by one team. Bronze, aluminium, stainless steel.
01
Curtain-wall panels, podium feature panels, ventilated façades. Anodised, PVDF-coated and powder-coated finishes — engineered to BD wind-load and curtain-wall codes.
02
Balcony, podium and lift-lobby balustrades. Designed to BS EN 1991 wind loads, finished in the same anodised tone as the surrounding cladding.
03
Fabricated to BD's Air Discharge Code, matched to the cladding finish so the building reads as one continuous skin — no visible service interruption.
04
Stainless steel, bronze and copper-anodised aluminium for lobbies, lift halls and clubhouses. For interiors that need to read as art, not as cladding.
05
Custom column cladding, signage and decorative screens. Hand-finished by craftsmen who have spent ten years polishing nothing else.
№ 03 — Core Advantages · 核心優勢
The reasons developers and architects keep coming back to Dongpai — drawn straight from how the group is built, audited and benchmarked.
№ 04 — Selected Work
A fifty-one-storey, MTR-podium development above Wong Chuk Hang station — a joint venture between five of Hong Kong's most established names. Our atelier delivered every aluminium balcony — handrail, AC grill, pipe-duct cladding — for all 804 flats, in a continuous bronze finish that wraps the building's gentle curve.
A new harbourfront address from SHK at Kai Tak. The podium's external cladding and 1,010 m² rhombic-shape suspended ceiling — 2,020 individual panels — were drawn, mocked up, fabricated and installed by our team from atelier to site.
Twenty-eight slender storeys above the King's Road tram line. Vertical bronze fins frame each balcony — a quiet rhythm against North Point's older skyline.
A boutique Wan Chai address where the metalwork carries from podium to penthouse — feature wall, column cladding, ceiling and balcony all detailed by the same atelier so the building reads as one piece.
Lu Tang Lai's first Kowloon high-rise for Wang On. We supplied the external cladding, balcony grill and ceiling panels — bronze and graphite-anodised aluminium, factory-finished to remove on-site touch-up entirely.
№ 05 — Project Archive
A continuing record — 1,500+ flats and counting, across thirteen years.
Request full project list ↗№ 06 — About Dongpai Metal
Dongpai Metal — 東排金屬 — is a Greater Bay Area metalworks group structured as four entities under one delivery contract. Our 47,000 m² flagship plant sits in Huizhou; Changlei Hardware, our 12,000 m² original workshop, runs in Dongguan; and our Hong Kong sales office in Tsuen Wan together with our engineering office in Kwun Tong handle shop-drawing collaboration with the city's architects and developers — New World, Sun Hung Kai, MTR Corporation, Wheelock, Wang On.
Dongpai's flagship plant in Huizhou spans 47,000 m² — laser cutting, brake forming, robotic welding, anodising and final finishing all under one roof. Together with our Dongguan partner Changlei (12,000 m²), the group delivers façade and structural metalwork at the scale Hong Kong podium projects demand.
Every project begins the same way — with a drawing reviewed at our Hong Kong office, a 1:1 mock-up erected in Huizhou, and a long meeting with the client and architect. We don't subcontract the parts that matter.
Visit our plants ↗№ 06.01 — Group Structure
匠心筑梦 · 智造未来 Craftsmanship builds dreams · Intelligence shapes the future
Six bays under one roof — laser, brake, weld, finish and assembly. No subcontracted parts.




№ 07 — Logistic
Our Huizhou flagship and Dongguan partner workshop sit 16 km apart on the eastern edge of the Greater Bay Area. From either loading dock to the Hong Kong border, it is around two hours. Most components leave our gate in the morning, clear the border by noon and are on site the next day — under a single bill of lading coordinated from our Hong Kong offices in Tsuen Wan and Kwun Tong.
№ 08 — Process
Eight steps, in two collaborative loops. No panel is mass-produced until the architect has signed off a 1:1 mock-up of every node.
Phase 01 Fabrication Drawing Collaboration 深化圖紙協作
The architect and curtain-wall consultant share the design intent — shop drawings, 3D models and tender documents.
We translate the design intent into manufacturing reality — every node, every joint, every tolerance.
The drawing goes back to the consultant and architect. We mark-up, we re-issue, we sit in the meeting until every red mark is closed.
Approved drawings move to the production floor — laser, brake, weld, anodise and finish — to build the 1:1 mock-up.
Phase 02 Trial Mock-up Collaboration 樣板驗證協作
The full-scale mock-up is erected — at our atelier, or on a designated site bay — for visual, weather and tolerance review.
We rehearse the install sequence on the mock-up — fixings, sealing, tolerances, water test. Adjustments fold back into the drawing.
The mock-up becomes the contract. The architect signs the drawing-of-record — and only then is it released to production.
Production proper — with two QC checkpoints between each process. Same atelier, same supervisor, panel-to-handover.
№ 09 — Certification (ISO 9001 · EN 1090-2 EXC3 · CQM)
Our structural steel and curtain-wall fabrication is certified to the European norm EN 1090-2 Execution Class EXC3 — the class reserved for complex structures: high-rise façades, structures with seismic, fatigue or wind-fatigue loading, and elements where failure has serious safety consequences. It is the same execution class specified for landmark super-tall curtain-wall projects across Europe and Asia where façade failure would have public-safety consequences.
№ 10 — Partners
№ 11 — Contact
If you're an architect, curtain-wall consultant or main contractor with a façade in scope, we'd like to see your drawings. We respond to enquiries within two business days — usually with a question, a clarification, and a rough capacity slot.
One contact · four entities · two plants · two HK offices.
+86 180 0305 9816 · +852 9667 0869 (HK)
dongpaijinshu1@gmail.com · WeChat: Lpy193101
For the full group structure — Huizhou flagship, Dongguan workshop, Hong Kong sales & engineering offices — see Group Structure ↗
Dongpai Metal Products (Guangdong) Co., Ltd.
No. 1 Nantang East Road, Chenjiang Street,
Zhongkai High-tech Zone, Huizhou, Guangdong
Dongguan Changlei Hardware Product Co., Ltd.
Room 102, Building 1, No. 20 Daxing Road,
Xiegang Town, Dongguan, Guangdong
Chang Lei Metal Products Limited
Room 11, 1/F, Block B, Hi-Tech Industrial Centre,
491–501 Castle Peak Road, Tsuen Wan, N.T., HK
Changqing Curtain Wall Engineering (Asia) Ltd.
RM 9042, 9/F, Block B, Chung Mei Centre,
15–17 Hing Yip Street, Kwun Tong, Kowloon, HK